daohang fenxiangbox searchbox qikanlogonew daohangnew searchboxnew navrightzone footerzone paper

Recovery of Molybdenum and Vanadium from Alkaline Leaching Solution of Spent Catalyst by Crystallization Precipitation AITranslate

Dalian Petrochemical Research Institute,China Petrochemical Corporation;Dalian Petrochemical Research Institute,China Petrochemical Corporation;Dalian Petrochemical Research Institute,China Petrochemical Corporation;Dalian Petrochemical Research Institute,China Petrochemical Corporation;Dalian Petrochemical Research Institute,China Petrochemical Corporation
AITranslate
Publisher: Editorial Office of Rare Metals and Cemented Carbides
Share Citation Information Add to Favorites

    Scan to share on WeChat or Moments

Use WeChat scan.
Share with WeChat friends or Moments

Abstract AITranslate

Alkaline treatment of spent hydrogenation catalyst has been widely studied and applied for its advantages of mild reaction condition,high metal recovery and simple composition of leaching solution.In order to improve the purity and recovery of molybdenum and vanadium in the products,the separation and recovery of molybdenum and vanadium from alkaline leaching solution are very important.The precipita-tion recovery process of molybdenum and vanadium in alkaline solution was studied in detail,and the effects of the precipitant dosage and pH value on the precipitation rate of molybdenum and vanadium in alkaline solution were investigated by thermodynamic calculation and condition experiments.The experimental results show that the pH value and the amount of precipitants have a great influence on the precipitation rates of molybdenum and vanadium,and the influence law is roughly consistent with the theoretical calculation result.Under the optimal reaction conditions,the precipitation rates of molybdenum and vanadium can reach 93%and 94%,respectively.NH4Cl and BaCl2 are used to separate Mo-V alkaline mixed solution by step-by-step precipitation,and 93.6%vanadium and 92.4%molybdenum can be respectively recovered by one-step precipitation separation.However,there is co-precipitation phenomenon of molybdenum and vanadium.After multiple dissolution and precipitation separation,the products with high purity can be obtained.

KeyWords AITranslate

spent hydrogenation catalyst vanadium molybdenum alkaline solution thermodynamic calculation crystal precipitation

1于博渊,张家靓,杨成,王丽华,陈永强,王成彦.废加氢催化剂中有价金属回收技术研究进展[J].有色金属科学与工程,2020,11(5):16-24. 被引量:4

2何如意,栗达,杨昆鹏,杨忠凯,李涛,任保增.煤焦油加氢废钼催化剂中回收钼的实验研究[J].现代化工,2020,40(11):139-143. 被引量:4

3马连湘,王犇.加氢脱硫废催化剂综合利用研究[J].无机盐工业,2006,38(8):48-50. 被引量:7

4刘腾,邱兆富,杨骥,曹礼梅,张巍.我国废炼油催化剂的产生量、危害及处理方法[J].化工环保,2015,35(2):159-164. 被引量:35

5丁扬力,肖连生,曹佐英,张贵清,曾理.N263从钼酸钠溶液中萃取分离钼钒[J].有色金属科学与工程,2017,8(1):15-20. 被引量:6

6刘公召,隋智通.从HDS废催化剂中提取钒和钼的研究[J].矿产综合利用,2002(2):39-41. 被引量:24

7刘公召,阎伟,梅晓丹,李雪姣,顾齐欣.从废加氢催化剂中提取钼的研究[J].矿冶工程,2010,30(2):70-72. 被引量:18

8李贺,刘旭恒,何利华.钙盐沉钒的热力学研究[J].稀有金属与硬质合金,2014,42(1):15-19. 被引量:3

9廖宇龙,李江涛.Mo(Ⅵ)-V(Ⅴ)-H_2O体系的热力学分析[J].粉末冶金材料科学与工程,2016,21(5):678-684. 被引量:5

1张阳,李东红,王毅,张岩岩,叶国田,陈留刚,田学坤.自由水对铝酸钙水泥水化产物之间转化的影响[J].耐火材料,2021,55(5):435-438. 被引量:4

2李凤善,马艺璇,黄忠源,梁文玉,刘猛.镍铁渣中硅铁镁元素提取热力学计算[J].冶金设备,2021(S01):27-30.

3冯可桃,吕健,阚高辉,郑铮辉,李莎,魏剑磊,李亚军.烧结过程氮气分压对(Ti, Nb)(C,N)基金属陶瓷组织和性能的影响[J].稀有金属与硬质合金,2021,49(6):47-54. 被引量:1

4朱立国,孔令鑫,徐俊杰,徐宝强,游彦军,杨斌,李一夫.采用Ho直接脱除钛废料中的固溶氧[J].有色金属工程,2022,12(1):42-50. 被引量:1

5刘袆帆,郑文雄,李素芬,肖更生,王琴,朱卫家,李思梅.板栗香精的制备及理化性质研究[J].中国调味品,2022,47(2):186-190.

6方燕红,杨晨曦,王成瑞,梁光芬,李言栋,段华美.不锈钢VOD精炼吹氧阶段脱碳保铬的热力学分析[J].连铸,2022,47(1):25-30. 被引量:3

7刘坤.塑料儿童用品中化学风险物质高通量快速检测技术[J].化纤与纺织技术,2021,50(6):84-85. 被引量:1

8崔鹏媛,沈庆峰,俞小花,杨帆,谢刚,金玉芬,金贵忠.黝铜矿碱性体系制备锑酸钠的试验研究[J].有色金属工程,2022,12(1):80-87.

9钟晶晶,胡磊,李荣斌,张少军,王正,刘风琴.皮江法炼镁工艺中镁蒸气及杂质冷凝过程热力学分析[J].轻金属,2021(12):37-41. 被引量:3

10陈爱祥,黄志鹏,姜宝伟,朱福兴,李亮,杜鑫,漆丽华.回用盐对铝粉除钒精制四氯化钛质量的影响研究[J].轻金属,2021(11):47-51. 被引量:1

Basic Information:

DOI:

Chinese Library Classification Number:TF111[冶金工程—冶金物理化学]

Citation Information:

Alkaline treatment of spent hydrogenation catalyst has been widely studied and applied for its advantages of mild reaction condition,high metal recovery and simple composition of leaching solution.In order to improve the purity and recovery of molybdenum and vanadium in the products,the separation and recovery of molybdenum and vanadium from alkaline leaching solution are very important.The precipita-tion recovery process of molybdenum and vanadium in alkaline solution was studied in detail,and the effects of the precipitant dosage and pH value on the precipitation rate of molybdenum and vanadium in alkaline solution were investigated by thermodynamic calculation and condition experiments.The experimental results show that the pH value and the amount of precipitants have a great influence on the precipitation rates of molybdenum and vanadium,and the influence law is roughly consistent with the theoretical calculation result.Under the optimal reaction conditions,the precipitation rates of molybdenum and vanadium can reach 93%and 94%,respectively.NH4Cl and BaCl2 are used to separate Mo-V alkaline mixed solution by step-by-step precipitation,and 93.6%vanadium and 92.4%molybdenum can be respectively recovered by one-step precipitation separation.However,there is co-precipitation phenomenon of molybdenum and vanadium.After multiple dissolution and precipitation separation,the products with high purity can be obtained.

quote

GB/T 7714-2015 [1] GUAN Yue-ming, ZHANG Cheng, YUAN Sheng-hua, et al. Recovery of Molybdenum and Vanadium from Alkaline Leaching Solution of Spent Catalyst by Crystallization Precipitation[J]. Rare Metals and Cemented Carbides, 2021(6): 9-14.
MLA [1] GUAN Yue-ming, et al., "Recovery of Molybdenum and Vanadium from Alkaline Leaching Solution of Spent Catalyst by Crystallization Precipitation." Rare Metals and Cemented Carbides, no. 6, 2021, pp. 9-14.
APA [1] GUAN Yue-ming, ZHANG Cheng, YUAN Sheng-hua, LIU Mei, & DING Wei. (2021). Recovery of Molybdenum and Vanadium from Alkaline Leaching Solution of Spent Catalyst by Crystallization Precipitation. Rare Metals and Cemented Carbides(6), 9-14.
IEEE [1] GUAN Yue-ming, ZHANG Cheng, YUAN Sheng-hua, LIU Mei, and DING Wei, "Recovery of Molybdenum and Vanadium from Alkaline Leaching Solution of Spent Catalyst by Crystallization Precipitation," Rare Metals and Cemented Carbides, no. 6, pp. 9-14, 2021. keywords: {spent hydrogenation catalyst;vanadium;molybdenum;alkaline solution;thermodynamic calculation;crystal precipitation}