Design and Research on the Energy-saving Measures for Bismuth Smelting Converter AITranslate
Abstract AITranslate
Bismuth smelting converter operation and conventional flue gas treatment processes are briefly introduced,and application of the related energy-saving measures are analyzed.The advantages and disadvantages are compared of the two energy-saving measures of dilute oxygen combustion and waste heat recovery from the flue gas.The characteristics of waste heat boiler design for bismuth melting converter are described.
KeyWords AITranslate
1汪立果.铋冶金[M]北京:冶金工业出版社,1986.
2周晓源,张自军.湖南柿竹园铋冶炼改扩建工艺设计[J].有色金属,2007,59(3):75-79. 被引量:7
3黄永峰,陈延进,王彤,何建平.稀氧燃烧技术的开发与应用[J].有色金属:冶炼部分,2011(2):9-11. 被引量:14
4池伟强.转炉烟气余热回收技术的探讨[J].煤气与热力,2006,26(1):43-45. 被引量:9
1周一工.炼钢转炉余热锅炉的改进设计[J].冶金能源,1997,16(4):48-51.
2周一工.一台炼钢转炉余热锅炉的改进设计[J].余热锅炉,1996(4):12-16.
3彭根南,阳绍伟,顾谦里,周凯,林雷英.锌挥发窑余热锅炉设计[J].中国有色金属学报,1998,8(2):309-313.
4李灿.有色冶金炉余热锅炉设计原则及应用[J].节能,2000,19(2):15-18.
5李灿.有色冶金炉余热锅炉设计原则及应用[J].节能技术,2000,18(1):14-16. 被引量:5
6李灿.有色冶金炉余热锅炉设计原则及应用[J].能源研究与利用,2000(2):7-9.
7邹启明,雷作胜,任忠鸣,邓康.连铸坯初始凝固行为研究现状[J].上海金属,2002,24(3):26-30.
8陆树友,张本所.金冠铜业闪速炉余热锅炉设计改进与应用[J].有色冶金设计与研究,2016,37(2):24-27. 被引量:2
9肖伟军.中碳锰铁精炼渣优化的试验研究[J].四川冶金,1989,11(1):36-41.
10岳雷.氧气转炉汽化冷却烟道传热计算[J].节能技术,2012,30(3):245-248. 被引量:5
Basic Information:
DOI:
Chinese Library Classification Number:TF806.26[冶金工程—有色金属冶金]
Citation Information:
Bismuth smelting converter operation and conventional flue gas treatment processes are briefly introduced,and application of the related energy-saving measures are analyzed.The advantages and disadvantages are compared of the two energy-saving measures of dilute oxygen combustion and waste heat recovery from the flue gas.The characteristics of waste heat boiler design for bismuth melting converter are described.
quote
| GB/T 7714-2015 | [1] SONG Shou-heng. Design and Research on the Energy-saving Measures for Bismuth Smelting Converter[J]. Rare Metals and Cemented Carbides, 2012(2): 56-59. |
| MLA | [1] SONG Shou-heng. "Design and Research on the Energy-saving Measures for Bismuth Smelting Converter." Rare Metals and Cemented Carbides, no. 2, 2012, pp. 56-59. |
| APA | [1] SONG Shou-heng. (2012). Design and Research on the Energy-saving Measures for Bismuth Smelting Converter. Rare Metals and Cemented Carbides(2), 56-59. |
| IEEE | [1] SONG Shou-heng, "Design and Research on the Energy-saving Measures for Bismuth Smelting Converter," Rare Metals and Cemented Carbides, no. 2, pp. 56-59, 2012. keywords: {bismuth smelting converter;energy-saving measure;dilute oxygen combustion;waste heat recovery from flue gas;waste heat boiler design} |
