daohang fenxiangbox searchbox qikanlogonew daohangnew searchboxnew navrightzone footerzone paper

Design and Research on the Energy-saving Measures for Bismuth Smelting Converter AITranslate

Changsha Nonferrous Metallurgical Design Research Institute Co., Ltd.
AITranslate
Publisher: Editorial Office of Rare Metals and Cemented Carbides
Share Citation Information Add to Favorites

    Scan to share on WeChat or Moments

Use WeChat scan.
Share with WeChat friends or Moments

Abstract AITranslate

Bismuth smelting converter operation and conventional flue gas treatment processes are briefly introduced,and application of the related energy-saving measures are analyzed.The advantages and disadvantages are compared of the two energy-saving measures of dilute oxygen combustion and waste heat recovery from the flue gas.The characteristics of waste heat boiler design for bismuth melting converter are described.

KeyWords AITranslate

bismuth smelting converter energy-saving measure dilute oxygen combustion waste heat recovery from flue gas waste heat boiler design

1汪立果.铋冶金[M]北京:冶金工业出版社,1986.

2周晓源,张自军.湖南柿竹园铋冶炼改扩建工艺设计[J].有色金属,2007,59(3):75-79. 被引量:7

3黄永峰,陈延进,王彤,何建平.稀氧燃烧技术的开发与应用[J].有色金属:冶炼部分,2011(2):9-11. 被引量:14

4池伟强.转炉烟气余热回收技术的探讨[J].煤气与热力,2006,26(1):43-45. 被引量:9

1周一工.炼钢转炉余热锅炉的改进设计[J].冶金能源,1997,16(4):48-51.

2周一工.一台炼钢转炉余热锅炉的改进设计[J].余热锅炉,1996(4):12-16.

3彭根南,阳绍伟,顾谦里,周凯,林雷英.锌挥发窑余热锅炉设计[J].中国有色金属学报,1998,8(2):309-313.

4李灿.有色冶金炉余热锅炉设计原则及应用[J].节能,2000,19(2):15-18.

5李灿.有色冶金炉余热锅炉设计原则及应用[J].节能技术,2000,18(1):14-16. 被引量:5

6李灿.有色冶金炉余热锅炉设计原则及应用[J].能源研究与利用,2000(2):7-9.

7邹启明,雷作胜,任忠鸣,邓康.连铸坯初始凝固行为研究现状[J].上海金属,2002,24(3):26-30.

8陆树友,张本所.金冠铜业闪速炉余热锅炉设计改进与应用[J].有色冶金设计与研究,2016,37(2):24-27. 被引量:2

9肖伟军.中碳锰铁精炼渣优化的试验研究[J].四川冶金,1989,11(1):36-41.

10岳雷.氧气转炉汽化冷却烟道传热计算[J].节能技术,2012,30(3):245-248. 被引量:5

Basic Information:

DOI:

Chinese Library Classification Number:TF806.26[冶金工程—有色金属冶金]

Citation Information:

Bismuth smelting converter operation and conventional flue gas treatment processes are briefly introduced,and application of the related energy-saving measures are analyzed.The advantages and disadvantages are compared of the two energy-saving measures of dilute oxygen combustion and waste heat recovery from the flue gas.The characteristics of waste heat boiler design for bismuth melting converter are described.

quote

GB/T 7714-2015 [1] SONG Shou-heng. Design and Research on the Energy-saving Measures for Bismuth Smelting Converter[J]. Rare Metals and Cemented Carbides, 2012(2): 56-59.
MLA [1] SONG Shou-heng. "Design and Research on the Energy-saving Measures for Bismuth Smelting Converter." Rare Metals and Cemented Carbides, no. 2, 2012, pp. 56-59.
APA [1] SONG Shou-heng. (2012). Design and Research on the Energy-saving Measures for Bismuth Smelting Converter. Rare Metals and Cemented Carbides(2), 56-59.
IEEE [1] SONG Shou-heng, "Design and Research on the Energy-saving Measures for Bismuth Smelting Converter," Rare Metals and Cemented Carbides, no. 2, pp. 56-59, 2012. keywords: {bismuth smelting converter;energy-saving measure;dilute oxygen combustion;waste heat recovery from flue gas;waste heat boiler design}