daohang fenxiangbox searchbox qikanlogonew daohangnew searchboxnew navrightzone footerzone paper

Process Design on Comprehensive Treatment of Three Wastes during Tantalum-Niobium Hydrometallurgical Process AITranslate

Changsha Engineering and Research Institute Ltd.of Nonferrous Metallurgy;Hunan Nonfemet&Komeng Environmental Protection Technology Co.,Ltd.
AITranslate
Publisher: Editorial Office of Rare Metals and Cemented Carbides
Share Citation Information Add to Favorites Download PDF

    Scan to share on WeChat or Moments

Use WeChat scan.
Share with WeChat friends or Moments

Abstract AITranslate

The sources,properties,and treatment measures of three wastes in the hydrometallurgical process of tantalum-niobium concentrate are comprehensively introduced.Among the three wastes,the waste water undergoes refined treatment,with the extraction raffinate containing radioactive substance or heavy metals being treated separately,achieving complete reuse through resource processing without any discharge.Other production wastewater is treated using lime for step-by-step defluorination and desulfation and negative pressure stripping deammoniation for ammonia recycling.The stripping deammoniation effluent is subjected to pH adjustment,flocculent deposition,and deep defluorination before being discharged to meet the standards.All exhaust gases are collected and sent to the purification system for discharge at high altitude after purification.The purification efficiency of pollution factors in process waste gas,dry waste gas and calcined waste gas exceeds 90%,and the boiler flue gas can be directly discharged by using low-nitrogen burners.Low-level radioactive solid waste and hazardous waste are temporarily stored in the radioactive residue storage and hazardous waste storage within the plant respectively,and are regularly entrusted to qualified units for disposal.General industrial solid waste is either comprehensively utilized or undergoes regular sanitary landfill with domestic waste.The process design not only realizes the standard discharge of three wastes but also promotes the efficient recovery and recycling of resources.

KeyWords AITranslate

tantalum niobium hydrometallurgy three wastes source property treatment measure environmental protection process design
No data

Basic Information:

DOI:

Chinese Library Classification Number:TF841.6[冶金工程—有色金属冶金]

Citation Information:

The sources,properties,and treatment measures of three wastes in the hydrometallurgical process of tantalum-niobium concentrate are comprehensively introduced.Among the three wastes,the waste water undergoes refined treatment,with the extraction raffinate containing radioactive substance or heavy metals being treated separately,achieving complete reuse through resource processing without any discharge.Other production wastewater is treated using lime for step-by-step defluorination and desulfation and negative pressure stripping deammoniation for ammonia recycling.The stripping deammoniation effluent is subjected to pH adjustment,flocculent deposition,and deep defluorination before being discharged to meet the standards.All exhaust gases are collected and sent to the purification system for discharge at high altitude after purification.The purification efficiency of pollution factors in process waste gas,dry waste gas and calcined waste gas exceeds 90%,and the boiler flue gas can be directly discharged by using low-nitrogen burners.Low-level radioactive solid waste and hazardous waste are temporarily stored in the radioactive residue storage and hazardous waste storage within the plant respectively,and are regularly entrusted to qualified units for disposal.General industrial solid waste is either comprehensively utilized or undergoes regular sanitary landfill with domestic waste.The process design not only realizes the standard discharge of three wastes but also promotes the efficient recovery and recycling of resources.

quote

GB/T 7714-2015 [1] CUI Jia-na, WU Ban. Process Design on Comprehensive Treatment of Three Wastes during Tantalum-Niobium Hydrometallurgical Process[J]. Rare Metals and Cemented Carbides, 2023(6): 23-28.
MLA [1] CUI Jia-na, and WU Ban. "Process Design on Comprehensive Treatment of Three Wastes during Tantalum-Niobium Hydrometallurgical Process." Rare Metals and Cemented Carbides, no. 6, 2023, pp. 23-28.
APA [1] CUI Jia-na, & WU Ban. (2023). Process Design on Comprehensive Treatment of Three Wastes during Tantalum-Niobium Hydrometallurgical Process. Rare Metals and Cemented Carbides(6), 23-28.
IEEE [1] CUI Jia-na and WU Ban, "Process Design on Comprehensive Treatment of Three Wastes during Tantalum-Niobium Hydrometallurgical Process," Rare Metals and Cemented Carbides, no. 6, pp. 23-28, 2023. keywords: {tantalum niobium hydrometallurgy;three wastes;source;property;treatment measure;environmental protection;process design}